Hee-Sung Park
- 시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임 (Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 6 (décembre 2009). (2009):
- 시스템 다이내믹스를 이용한 건설성과 인과지도 개발 (Development of a Construction Performance Causal Map Using System Dynamics). Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 2 (avril 2009). (2009):
- Conceptual framework of construction productivity estimation. Dans: KSCE Journal of Civil Engineering, v. 10, n. 5 (septembre 2006). (2006):
- The impact of Gyeongbu High Speed Rail construction on regional economic growth. Dans: KSCE Journal of Civil Engineering, v. 17, n. 6 (août 2013). (2013):
- The direct employment impact analysis of highway construction investments. Dans: KSCE Journal of Civil Engineering, v. 16, n. 6 (septembre 2012). (2012):
- Innovative construction management method: Assessment of lean construction implementation. Dans: KSCE Journal of Civil Engineering, v. 10, n. 6 (novembre 2006). (2006):
- Benchmarking of Construction Productivity. Dans: Journal of Construction Engineering and Management, v. 131, n. 7 (juillet 2005). (2005):
- Design–information technology and performances in building and industrial projects. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 10 (octobre 2008). (2008):