Chul-Ki Chang
- A Case Study on Productivity Analysis and Methods Improvement for Masonry Work. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 4 (August 2013). (2013):
- 시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임 (Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 6 (Dezember 2009). (2009):
- Comparison of Efficiency and Satisfaction Level on Different Construction Management Methods for Public Construction Projects in Korea. In: KSCE Journal of Civil Engineering, v. 23, n. 6 (Mai 2019). (2019):
- Logistic Regression Modeling to Determine Projects impacted by Schedule Compression. In: KSCE Journal of Civil Engineering, v. 23, n. 4 (März 2019). (2019):
- Strategic selection of green construction products. In: KSCE Journal of Civil Engineering, v. 16, n. 7 (Oktober 2012). (2012):
- Critical review of previous studies on labor productivity loss due to overtime. In: KSCE Journal of Civil Engineering, v. 21, n. 7 (Mai 2017). (2017):
- Monte Carlo Simulation Approach to Support Alliance Team Selection. In: Journal of Construction Engineering and Management, v. 135, n. 10 (Oktober 2009). (2009):
- Impact of Overmanning on Mechanical and Sheet Metal Labor Productivity. In: Journal of Construction Engineering and Management, v. 133, n. 1 (Januar 2007). (2007):
- Quantifying the Impact of Schedule Compression on Labor Productivity for Mechanical and Sheet Metal Contractor. In: Journal of Construction Engineering and Management, v. 133, n. 4 (April 2007). (2007):
- Impact of Shift Work on Labor Productivity for Labor Intensive Contractor. In: Journal of Construction Engineering and Management, v. 134, n. 3 (März 2008). (2008):