0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Civil Engineering Magazine, , n. 2, v. 46
Page(s): 84-86
Abstrait:

This report includes the planning, design and construction procedure of the world’s third longest double deck, cantilever bridge, Osaka Port Bridge, which was completed in July, l974, in Osaka City, Japan. The geographical and meteorological characteristics at the site presented difficult foundation problems and design problems against strong earthquakes and winds. Weldable super high strength steels, 114,000 psi (80 kg/mm²) up to 2.95 in. (75 mm) thickness, were newly produced for this bridge. It took only 3.5 hours to lift the 610 ft (186 m) suspended truss span weighing 4200 tons from the sea to a height of 197 ft (60 m).

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10015603
  • Publié(e) le:
    25.07.2004
  • Modifié(e) le:
    14.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine