0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Civil Engineering Magazine, , n. 2, v. 46
Seite(n): 84-86
Abstrakt:

This report includes the planning, design and construction procedure of the world’s third longest double deck, cantilever bridge, Osaka Port Bridge, which was completed in July, l974, in Osaka City, Japan. The geographical and meteorological characteristics at the site presented difficult foundation problems and design problems against strong earthquakes and winds. Weldable super high strength steels, 114,000 psi (80 kg/mm²) up to 2.95 in. (75 mm) thickness, were newly produced for this bridge. It took only 3.5 hours to lift the 610 ft (186 m) suspended truss span weighing 4200 tons from the sea to a height of 197 ft (60 m).

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10015603
  • Veröffentlicht am:
    25.07.2004
  • Geändert am:
    14.08.2014
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine