Supply chain cost model for prefabricated building material based on time-driven activity-based costing
Auteur(s): |
Yong-Woo Kim
Seung-Heon Han June-Seong Yi SooWon Chang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Canadian Journal of Civil Engineering / Revue canadienne de génie civil, avril 2016, n. 4, v. 43 |
Page(s): | 287-293 |
DOI: | 10.1139/cjce-2015-0010 |
- Informations
sur cette fiche - Reference-ID
10085198 - Publié(e) le:
04.12.2018 - Modifié(e) le:
04.12.2018