Seung-Heon Han
- Measuring risk-associated activity's duration: A fuzzy set theory application. Dans: KSCE Journal of Civil Engineering, v. 14, n. 5 (juillet 2010). (2010):
- Supply chain cost model for prefabricated building material based on time-driven activity-based costing. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 4 (avril 2016). (2016):