0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Yi, June-Seong (2012): Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 12, n. 6 (décembre 2012).

    https://doi.org/10.5345/jkibc.2012.12.6.648

  2. Lee, Sang-Hyun / Yi, June-Seong / Shin, Seung-Woo / Kang, Hae-Min (2011): Revitalization Methods of EIFS for High-rise Residential Buildings through Using TACT and Gangform System with Hanging Scaffolding. Dans: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 11, n. 4 (août 2011).

    https://doi.org/10.5345/jkibc.2011.11.4.407

  3. Lee, SeungYeon / Jang, YeEun / Yi, June-Seong / Son, JeongWook (2023): Identifying Critical Risk Factors and Management Activities for Effective Offsite Construction Projects during Construction Phase. Dans: Journal of Management in Engineering (ASCE), v. 39, n. 4 (juillet 2023).

    https://doi.org/10.1061/jmenea.meeng-5310

  4. Kim, Siyeon / Lee, Heerim / Hwang, Sungjoo / Yi, June-Seong / Son, JeongWook (2021): Construction workers’ awareness of safety information depending on physical and mental load. Dans: Journal of Asian Architecture and Building Engineering, v. 21, n. 3 (août 2021).

    https://doi.org/10.1080/13467581.2021.1908899

  5. Yi, June-Seong / Kim, Yong-Woo / Lim, Ji Youn / Lee, JeeHee (2017): Activity-based life cycle analysis of a curtain wall supply for reducing its environmental impact. Dans: Energy and Buildings, v. 138 (mars 2017).

    https://doi.org/10.1016/j.enbuild.2016.11.061

  6. Lee, JeeHee / Ham, Youngjib / Yi, June-Seong / Son, JeongWook (2020): Effective Risk Positioning through Automated Identification of Missing Contract Conditions from the Contractor’s Perspective Based on FIDIC Contract Cases. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 3 (mai 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000757

  7. Song, Seung-Yeong / Yi, June-Seong / Koo, Bo-Kyoung (2008): Insulation plan of aluminum curtain wall-fastening unit for high-rise residential complex. Dans: Building and Environment, v. 43, n. 7 (juillet 2008).

    https://doi.org/10.1016/j.buildenv.2007.03.013

  8. Sung, Yoo-Kyung / Lee, JeeHee / Yi, June-Seong / Son, JeongWook (2017): Establishment of Growth Strategies for International Construction Firms by Exploring Diversification-Related Determinants and Their Effects. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 5 (septembre 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000529

  9. Kim, Yong-Woo / Azari-N, Rahman / Yi, June-Seong / Bae, Jinwoo (2013): Environmental Impacts Comparison Between On-site Vs. Prefabricated Just-in-time (prefab-jit) Rebar Supply in Construction Projects. Dans: Journal of Civil Engineering and Management, v. 19, n. 5 (octobre 2013).

    https://doi.org/10.3846/13923730.2013.795186

  10. Hwang, Sungjoo / Lee, JeeHee / Yi, June-Seong / Kim, Mingyeong (2019): Korean public rental housing for residential stability of the younger population: analysis of policy impacts using system dynamics. Dans: Journal of Asian Architecture and Building Engineering, v. 18, n. 1 (janvier 2019).

    https://doi.org/10.1080/13467581.2019.1615494

  11. Lee, JeeHee / Yi, June-Seong / Son, JeongWook (2019): Development of Automatic-Extraction Model of Poisonous Clauses in International Construction Contracts Using Rule-Based NLP. Dans: Journal of Computing in Civil Engineering, v. 33, n. 3 (mai 2019).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000807

  12. Park, Sung-Chul / Yi, June-Seong / Koo, Kyo-Jin / Koo, Bonsang (2013): A new approach to improving the responsiveness to price fluctuations of the range estimating model through autocorrelation time-series analysis. Dans: KSCE Journal of Civil Engineering, v. 17, n. 2 (mars 2013).

    https://doi.org/10.1007/s12205-013-1926-0

  13. Kim, Yong-Woo / Han, Seung-Heon / Yi, June-Seong / Chang, SooWon (2016): Supply chain cost model for prefabricated building material based on time-driven activity-based costing. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 4 (avril 2016).

    https://doi.org/10.1139/cjce-2015-0010

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine