0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

The steel design for the new railway bridge over the River Sado in Portugal

Auteur(s):



Médium: article de revue
Langue(s): anglais
Publié dans: Steel Construction, , n. 4, v. 3
Page(s): 201-211
DOI: 10.1002/stco.201010033
Abstrait:

The new railway crossing over the River Sado at Alcacer do Sal in Portugal required a 2.7 km long bridge, comprising two approach viaducts and a main bridge. Steel-concrete composite decks were adopted, the approach viaducts having plate girder decks with 45 and 37.5 m spans, and the main bridge three spans of 160 m each with a box girder deck. The main bridge, with a continuous deck over 480 m, consists of three continuous bowstrings with a single plane of hangers on the bridge axis. The main aspects of the bridge concept design are described and the steel design in particular is discussed.

Mots-clé:
conception sismique pont mixte pont en arc pont ferroviaire
Disponible chez: Voir chez l'éditeur

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1002/stco.201010033.
  • Informations
    sur cette fiche
  • Reference-ID
    10064032
  • Publié(e) le:
    11.02.2011
  • Modifié(e) le:
    13.08.2014
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine