The steel design for the new railway bridge over the River Sado in Portugal
Autor(en): |
António Reis
Jean-Marie Cremer Alain Lothaire Nuno Lopes |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Steel Construction, Dezember 2010, n. 4, v. 3 |
Seite(n): | 201-211 |
DOI: | 10.1002/stco.201010033 |
Abstrakt: |
The new railway crossing over the River Sado at Alcacer do Sal in Portugal required a 2.7 km long bridge, comprising two approach viaducts and a main bridge. Steel-concrete composite decks were adopted, the approach viaducts having plate girder decks with 45 and 37.5 m spans, and the main bridge three spans of 160 m each with a box girder deck. The main bridge, with a continuous deck over 480 m, consists of three continuous bowstrings with a single plane of hangers on the bridge axis. The main aspects of the bridge concept design are described and the steel design in particular is discussed. |
Stichwörter: |
Erdbebenbemessung Ermüdung Verbundbrücke Bogenbrücke Eisenbahnbrücke
|
Verfügbar bei: | Siehe Verlag |
Bauwerke und Projekte
- Über diese
Datenseite - Reference-ID
10064032 - Veröffentlicht am:
11.02.2011 - Geändert am:
13.08.2014