Influence of pier settlement on contact behavior between CRTS II track and bridge in high-speed railways
Auteur(s): |
Zhaowei Chen
Hui Fang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering Structures, mai 2021, v. 235 |
Page(s): | 112007 |
DOI: | 10.1016/j.engstruct.2021.112007 |
- Informations
sur cette fiche - Reference-ID
10577929 - Publié(e) le:
02.03.2021 - Modifié(e) le:
02.03.2021