0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Budownictwo i Architektura, , n. 2, v. 3
Page(s): 015-032
DOI: 10.35784/bud-arch.2320
Abstrait:

Earned Value is a well-known project management tool that uses information on cost, schedule and work performance to establish the current status of the project. By means of a few simple rates, it allows the manager to extrapolate current trends to predict their likely final effect. The method is based on a simpli-fied model of a project, but proved to be useful in practice of cost control. It is being developed to account better for schedule and time aspects. The paper outlines the basic principles of the method and its recent extension, the Earned Schedule method, and, with help of a few examples, investigates into assumptions that affect their diagnostic and predictive accuracy.

License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution - Partage dans les Mêmes Conditions 4.0 (CC-BY-SA 4.0) International. Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et que le partage se fait dans les mêmes conditions (license) que l'original. Un lien vers la license (ci-dessus) toit être inclus. Toute altération vis-à-vis de l'original doit être indiquée.

  • Informations
    sur cette fiche
  • Reference-ID
    10476183
  • Publié(e) le:
    13.11.2020
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine