- Niepewność kosztów przedsięwzięciabudowlanego: statystyka to za mało. Dans: Builder, v. 317, n. 12 (22 novembre 2023). (2023):
- A model to support long-term building maintenance planning for multifamily housing. Dans: Journal of Building Engineering, v. 44 (décembre 2021). (2021):
- Time-Cost Relationship for Predicting Construction Duration. Dans: Budownictwo i Architektura, v. 12, n. 1 (mars 2013). (2013):
- (2008): Earned value method as a tool for project control. Dans: Budownictwo i Architektura, v. 3, n. 2 (décembre 2008).
- Analysis of Supply System Models for Planning Construction Project Logistics. Dans: Journal of Civil Engineering and Management, v. 11, n. 1 (mars 2005). (2005):
- Decision model for planning material supply channels in construction. Dans: Automation in Construction, v. 90 (juin 2018). (2018):
- The Simulation for selecting road works equipment. Dans: The Baltic Journal of Road and Bridge Engineering, v. 10, n. 3 (septembre 2015). (2015):