Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 6, v. 24
Page(s): 875-900
DOI: 10.1108/ecam-11-2015-0186
Abstrait:

Purpose

Although scientific research community has shown considerable interest in identifying critical success factors (CSFs) for public-private partnership (PPP) projects, yet effort at assessing and compare CSFs within similar PPP infrastructure projects received scant attention. The purpose of this paper is to identify, assess, and compare the CSFs in PPP transport infrastructure projects.

Design/methodology/approach

The study adopted literature review and three PPP case studies including structured interviews and review of documentary reports in each case study. The outcome of literature review provided a total list of 26 identified success factors, which was used to design a case study protocol using failure mode and effect analysis (FMEA) technique. FMEA was conducted on each 26 identified success factor to assess their criticality in the three PPP case studies.

Findings

The results of FMEA revealed a total of ten CSFs in the concession of the road; four CSFs in the concession of the airport; and eight CSFs in the concession of the seaport. Also, the cross-case analysis showed the three prevalent CSFs, this includes government involvement by providing guarantees, political support, and project economic viability.

Practical implications

The study findings including lessons learnt in each case study would positively influence policy development towards PPP transport infrastructure projects and the manner in which partners (i.e. public and private sector) go about the development of PPP transport projects.

Originality/value

This research would help PPP stakeholders to focus their attention and priorities in managing the identified CSFs in achieving long-term success in PPP transport infrastructure projects implementation.

Lieux géographiques

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/ecam-11-2015-0186.
  • Informations
    sur cette fiche
  • Reference-ID
    10576604
  • Publié(e) le:
    26.02.2021
  • Modifié(e) le:
    26.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine