0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Cross-sectional comparison of public-private partnerships in transport infrastructure development in Nigeria

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 6, v. 24
Seite(n): 875-900
DOI: 10.1108/ecam-11-2015-0186
Abstrakt:

Purpose

Although scientific research community has shown considerable interest in identifying critical success factors (CSFs) for public-private partnership (PPP) projects, yet effort at assessing and compare CSFs within similar PPP infrastructure projects received scant attention. The purpose of this paper is to identify, assess, and compare the CSFs in PPP transport infrastructure projects.

Design/methodology/approach

The study adopted literature review and three PPP case studies including structured interviews and review of documentary reports in each case study. The outcome of literature review provided a total list of 26 identified success factors, which was used to design a case study protocol using failure mode and effect analysis (FMEA) technique. FMEA was conducted on each 26 identified success factor to assess their criticality in the three PPP case studies.

Findings

The results of FMEA revealed a total of ten CSFs in the concession of the road; four CSFs in the concession of the airport; and eight CSFs in the concession of the seaport. Also, the cross-case analysis showed the three prevalent CSFs, this includes government involvement by providing guarantees, political support, and project economic viability.

Practical implications

The study findings including lessons learnt in each case study would positively influence policy development towards PPP transport infrastructure projects and the manner in which partners (i.e. public and private sector) go about the development of PPP transport projects.

Originality/value

This research would help PPP stakeholders to focus their attention and priorities in managing the identified CSFs in achieving long-term success in PPP transport infrastructure projects implementation.

Geografische Orte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-11-2015-0186.
  • Über diese
    Datenseite
  • Reference-ID
    10576604
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine