The contribution of the client representative to the creation and maintenance of good project inter‐team relationships

Auteur(s):
Médium: article de revue
Langue(s): anglais
Publié dans: Engineering, Construction and Architectural Management, , n. 1, v. 5
Page(s): 51-57
DOI: 10.1108/eb021060
Abstrait:

Conclusions flowing from an investigation of the literature together with the results of two recent research studies suggest that the relationship quality between the client representative (CR), the design team and the team undertaking construction management activities is a major factor governing construction time performance (CTP). While the managerial performance of the manager of the construction team was found to be a pivotal factor, the interaction between the CR and the construction management team was found to be crucial in facilitating good CTP, i.e. achieving a fast build rate. One interesting and valuable insight gained from the research studies reviewed in the present paper suggests that selection of a CR should be based on the capacity of the CR to gain the confidence of the project team. The CR characteristics which are significantly associated with good CTP are also discussed. It is proposed that these provide useful selection guidelines for appointing the appropriate person or team to represent the client's interests within the project coalition.

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant. Le texte intégral est accessible chez l'éditeur. DOI: 10.1108/eb021060.
  • Informations
    sur cette fiche
  • Reference-ID
    10575584
  • Publié(e) le:
    27.02.2021
  • Modifié(e) le:
    27.02.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine