The contribution of the client representative to the creation and maintenance of good project inter‐team relationships

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 1, v. 5
Seite(n): 51-57
DOI: 10.1108/eb021060
Abstrakt:

Conclusions flowing from an investigation of the literature together with the results of two recent research studies suggest that the relationship quality between the client representative (CR), the design team and the team undertaking construction management activities is a major factor governing construction time performance (CTP). While the managerial performance of the manager of the construction team was found to be a pivotal factor, the interaction between the CR and the construction management team was found to be crucial in facilitating good CTP, i.e. achieving a fast build rate. One interesting and valuable insight gained from the research studies reviewed in the present paper suggests that selection of a CR should be based on the capacity of the CR to gain the confidence of the project team. The CR characteristics which are significantly associated with good CTP are also discussed. It is proposed that these provide useful selection guidelines for appointing the appropriate person or team to represent the client's interests within the project coalition.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/eb021060.
  • Über diese
    Datenseite
  • Reference-ID
    10575584
  • Veröffentlicht am:
    27.02.2021
  • Geändert am:
    27.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine