Construction and Erection of the Rhine Bridge at Dusseldorf-Neuss
Auteur(s): |
M. Pfeiffer
|
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Structural Engineering International, février 1992, n. 1, v. 2 |
Page(s): | 28-33 |
DOI: | 10.2749/101686692780617138 |
Abstrait: |
In 1987, a new railway bridge was completed in Dusseldorf with a main span of 250 m. This is the largest span of a railway bridge in Germany and the first four-tracked large bridge. Fundamental characteristics of modern steel bridge construction are demonstrated in the construction and assembly of this bridge. |