General Information
Name in local language: | Jembatan Nara Singa; Jembatan 2 Barelang |
---|---|
Other name(s): | Barelang 2 Bridge |
Completion: | 1997 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Tonton, Riau Islands, Indonesia Nipah Island, Riau Islands, Indonesia |
---|---|
Part of: | |
Coordinates: | 0° 58' 35.75" N 104° 2' 58.26" E |
Technical Information
Dimensions
main span | 160 m | |
total length | 420 m | |
clearance | 18 m | |
number of lanes | 2 x 2 | |
deck | deck width | 18 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- VSL Completes the Longest Balanced Cantilever Bridge in Indonesia. In: VSL News, v. 8, n. 1 ( 1997), pp. 8-9. (1997):
- About this
data sheet - Structure-ID
20004149 - Published on:
05/07/2002 - Last updated on:
18/01/2024