0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Pont de Tonnay-Charente
Beginning of works: 17 February 1841
Completion: 21 April 1842
Duration of works: 11 months
Status: demolished (1934)

Project Type

Location

Location: , , ,
, , ,
Crossed:
  • Charente River
Replaced by: Tonnay-Charente Bridge (1935)
Coordinates: 45° 56' 24" N    0° 53' 9" W
Show coordinates on a map

Technical Information

Dimensions

total length 623 m
vertical navigation clearance 22 m
approach viaduct
total length 416 m
main bridge
main span 90 m
total length 204 m

Materials

piers masonry
approach viaducts masonry
deck flooring timber

Participants

Initial construction
Engineering
Construction
Repairs (1884)
Engineering

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20087607
  • Published on:
    09/12/2023
  • Last updated on:
    09/12/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine