General Information
Name in local language: | Jembatan Sultan Zainal Abidin; Jembatan 4 Barelang |
---|---|
Other name(s): | Barelang 4 Bridge |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Setoko Island, Riau Islands, Indonesia Rempang Island, Riau Islands, Indonesia |
---|---|
Part of: | |
Coordinates: | 0° 56' 46.85" N 104° 4' 41.77" E |
Technical Information
Dimensions
main span | 145 m | |
total length | 365 m | |
clearance | 15 m | |
number of lanes | 2 | |
deck | deck width | 18 m |
Materials
deck |
prestressed concrete
|
---|---|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20008075 - Published on:
10/02/2003 - Last updated on:
16/01/2024