General Information
Other name(s): | Viaduc de la Rauze |
---|---|
Completion: | 2000 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nadillac, Lot (46), Occitanie, France |
---|---|
Address: | A20 |
Carries: |
|
Crosses: |
|
Part of: | |
Coordinates: | 44° 32' 42" N 1° 30' 57" E |
Technical Information
Dimensions
total length | 556 m | |
span lengths | 91.364 - 3 x 130 m - 73.794 m | |
number of spans | 4 | |
height above valley floor or water | 101 m | |
deck | deck depth | 3.5 - 7.8 m |
deck width | 23.94 m |
Quantities
reinforcing steel | 2 200 t |
Cost
cost of construction | French Franc 160 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Owner
Client
Architecture
- Charles Lavigne (architect)
- Alain Montois (architect)
Structural engineering
Main contractor
Co-contractor
Subcontractor
Prestressing
Reinforcing steel
Formwork
Relevant Web Sites
- About this
data sheet - Structure-ID
20002541 - Published on:
01/01/2002 - Last updated on:
05/02/2016