General Information
Completion: | 1970 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Prestressed concrete bridge |
Construction method: |
original configuration: Balanced cantilever method |
Structure: |
original configuration: Box girder bridge original configuration: Haunched girder bridge current configuration: Single-span two-pylon cable-stayed bridge |
Location
Technical Information
Dimensions
main span | 138 m |
Materials
deck |
prestressed concrete
|
---|
Chronology
2002 — 2003 | Strengthening of the original cantilever box girder bridge by addition of pylons and cable-stays to extend the service life at least until 2025. |
---|
Participants
Reconfiguration (2002-2003)
Owner
Design
Contractor
Subcontractor
Stay cables
Stay cable steel supplier
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Assessment and strengthening of two cantilever-type concrete bridges. Presented at: IABSE Symposium: Long-Span and High-Rise Structures, Kobe, Japan, September 1998, pp. 293-298. (1998):
- Raising expectations: a cantilever bridge becomes a cable-stayed crossing. In: Bridge Design & Engineering, v. 9, n. 30 (1st Quarter 2003), pp. 31-32. (2003):
- About this
data sheet - Structure-ID
20009226 - Published on:
05/05/2003 - Last updated on:
05/02/2016