General Information
Completion: | 1973 |
---|---|
Status: | in use |
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Structure: |
Three-span continuous girder bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nijmegen, Gelderland, Netherlands |
---|---|
Coordinates: | 51° 49' 3" N 5° 48' 42" E |
Technical Information
Dimensions
main span | 112.2 m | |
total length | 187 m | |
span lengths | 37.4 m - 112.2 m - 37.4 m | |
deck width | 2 x 14.35 m | |
number of spans | 3 | |
horizontal navigation clearance | 100.0 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Case Studies and Applied Products
RESTON®POT – Pot Bearings
mageba Pot Bearings are durable bearings that can be used in many situations, whether in big or small bridges, or a variety of engineering structures.
[more]TENSA®MODULAR LR & LR-LS – Modular expansion joints
Modular Expansion Joints can be constructed for any movements, from about 100 mm up to 2,000 mm and more. They allow movements in all 3 directions and rotations around all 3 axes.
[more]Participants
Relevant Web Sites
- About this
data sheet - Structure-ID
20064713 - Published on:
14/03/2013 - Last updated on:
05/02/2016