General Information
Project Type
Function / usage: |
Railroad (railway) bridge |
---|---|
Structure: |
Girder bridge |
Location
Location: |
Bordeaux, Gironde (33), Nouvelle-Aquitaine, France |
---|---|
Crosses: |
|
To replace: |
Eiffel Footbridge (1860)
|
Coordinates: | 44° 49' 56" N 0° 33' 8" W |
Technical Information
Dimensions
length | 445 m | |
bridge surface | 8 400 m² | |
deck | number of tracks | 2008: 2 2015: 4 |
piles | total length | 600 m |
Quantities
structural steel | 7 000 t | |
concrete volume | 20 000 m³ | |
reinforcing steel | 1 200 t | |
water proofing | 5 000 m² | |
foundations | volume of extracted material | 13 000 m³ |
sheet piling | 2 200 t |
Cost
cost of construction | Euro 51 000 000 |
Participants
Owner
Architecture
Technical advisor to the owner
Structural engineering
Main contractor
Co-contractor
Steel construction
Foundations
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bordeaux. Début du chantier de suppression du bouchon ferroviaire. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5345 (5 May 2006). (2006):
- Bordeaux. Un sixième pont sur la Garonne. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5430 (21 December 2007), pp. 34. (2007):
- Bordeaux: le nouveau pont ferroviaire sur la Garonne. In: Travaux, n. 849 (February 2008), pp. 28-38. (2008):
- Communauté urbaine de Bordeaux. Feu vert pour le pont Bacalan-Bastide. In: Le Moniteur des Travaux Publics et du Bâtiment, n. 5416 (14 September 2007), pp. 53. (2007):
- Le nouveau pont ferroviaire sur la Garonne à Bordeaux. In: Travaux, n. 827 (February 2006), pp. 28-37. (2006):