0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Sörnzig–Fischheim Suspension Bridge

General Information

Completion: 1954
Status: in use

Project Type

Awards and Distinctions

Location

Location: , , ,
Crosses:
  • Zwickauer Mulde River
See also: Rochsburg Suspension Bridge (1954)
Coordinates: 51° 1' 18.44" N    12° 47' 23.59" E
Show coordinates on a map

Technical Information

Dimensions

number of spans 3

Materials

deck steel
piers reinforced concrete
pylons steel
truss steel

Structural Description

This suspension bridge, one of three built in the GDR from 1954 to 1956, is a rather a-typical suspension bridge. It consists of a suspended central span flanked on either site by through trusses tapering from the pylons towards the abutments. The suspension cables are not anchored in rock, soil or a concrete anchorage block, but instead they are connected to the top chords of the side-span trusses.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20033144
  • Published on:
    08/11/2007
  • Last updated on:
    04/06/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine