General Information
Project Type
Structure: |
Single-span two-tower suspension bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Steel bridge Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Wuhan, Hubei, China |
---|---|
Crosses: |
|
Coordinates: | 30° 37' 43.78" N 114° 32' 14.35" E |
Coordinates: | 30° 38' 25.42" N 114° 33' 49.71" E |
Technical Information
Dimensions
main span | 1 280 m | |
total length | 2 725 m | |
pylon 1 | height | 166 m |
pylon 2 | height | 169 m |
Materials
pylons |
reinforced concrete
|
---|
Participants
Co-contractor
Formwork & shoring
Relevant Web Sites
Relevant Publications
- Another Yangtze Bridge takes shape. In: Bridge Design & Engineering, v. 12, n. 44 (3rd Quarter 2006), pp. 8. (2006):
- Balinghe oltre Millau. In: Strade e Autostrade, v. 13, n. 76 (July 2009), pp. 64-68. (2009):
- (2009): China's Major Bridges. Presented at: IABSE Workshop: Recent Major Bridges, Shanghai, China, 11-12 May 2009, pp. 1-24.
- Twinned formwork prompts race to top. In: Bridge Design & Engineering, v. 11, n. 40 (3rd Quarter 2005), pp. 56.
- About this
data sheet - Structure-ID
20017909 - Published on:
02/10/2005 - Last updated on:
05/02/2016