0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2 September 1952
Status: in use

Project Type

Location

Location: , , ,
Location description:

Grandfather Mountain

Coordinates: 36° 5' 42.09" N    81° 49' 56.14" W
Show coordinates on a map

Technical Information

Dimensions

main span 69.5 m

Cost

cost of construction United States dollar 15 000

Chronology

2 September 1952

Dedication.

1999

Bridge is completely reconstructed with the exception of the towers. (Costs: USD 300 000)

Notes

The term "mile high" refers to the structure's elevation above sea level (5,305 feet).

Participants

Design
Reconfiguration
Design
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20004547
  • Published on:
    17/08/2002
  • Last updated on:
    23/01/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine