Queensferry Crossing
-
Kaern, Jens Christian / Hansen, John Elnegaard (2017): 16.13: Queensferry crossing cable-stayed composite bridge. Dans: ce/papers, v. 1, n. 2-3 (septembre 2017), pp. 4143-4152.
https://doi.org/10.1002/cepa.471
-
Bridge leads Forth field. Dans: Bridge Update, n. 70 (septembre 2007), pp. 2.
-
Ruas, Simon / Annan, Rachid (2018): Cable Stays – Queensferry Crossing. Présenté pendant: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, pp. S19-1.
https://doi.org/10.2749/nantes.2018.s19-1
-
Zhu, Licheng / McCrum, Daniel / Keenahan, Jennifer (2024): Capability analysis of computational fluid dynamics models in wind shield study on Queensferry Crossing, Scotland. Dans: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 177, n. 1 (mars 2024), pp. 1-13.
https://doi.org/10.1680/jbren.21.00095
-
Curran, Peter (2016): Challenges in the Design and Construction of the Queensferry Crossing. Présenté pendant: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, pp. 2685-2692.
https://doi.org/10.2749/stockholm.2016.2684