Pont de Chelas-Barreiro
- Third Tagus set for the off. Dans: Bridge Update, n. 75 (avril 2008), pp. 1.
- (2010): Two large bridge projects in environmentally constrained areas. Présenté pendant: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 532-533.