0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Crystal Palace Dinosaur Bridge fabrication and installation

Crystal Palace Dinosaur Swing Bridge Client: Friends of Crystal Palace Dinosaurs Architect: Tonkin Liu Structural Engineer: Arup Detailed Structural Engineer (substructure): Cake Engineering Fabrication & Main Contractor: Cake Industries Cutting: M-Tec Ltd Galvanising: Joseph Ash, Chesterfield Piling and foundations: Capital Piling Lifting: City Lifting Fabrication team: Oliver Cheyne, Carwyn Evans, Ed Jacobs, Marnie Robinson, Quinn Thompson Installation team: Alastair Tweedie, Oliver Cheyne, Andy Creed, Keefer Erickson, David Knight Footage prepared by: Cake Industries with assistance from Timelapse Scotland (Stuart Younger) www.cakeindustries.co.uk © Cake Industries 2020-21

Media-ID: 363990
Créé(s) en/le: 31 janvier 2021
Auteur/Source:

Cake Industries / YouTube

Note légale / conditions d'utilisation:

Cette oeuvre ne peut être utilisée sans la permission de l'auteur ou détenteur des droits.

Publié(e) le:
Modifié(e) le: 08.10.2021

D'autres médias pour cet ouvrage

Royaume-Uni (2021)