Crystal Palace Dinosaur Bridge fabrication and installation
Crystal Palace Dinosaur Swing Bridge Client: Friends of Crystal Palace Dinosaurs Architect: Tonkin Liu Structural Engineer: Arup Detailed Structural Engineer (substructure): Cake Engineering Fabrication & Main Contractor: Cake Industries Cutting: M-Tec Ltd Galvanising: Joseph Ash, Chesterfield Piling and foundations: Capital Piling Lifting: City Lifting Fabrication team: Oliver Cheyne, Carwyn Evans, Ed Jacobs, Marnie Robinson, Quinn Thompson Installation team: Alastair Tweedie, Oliver Cheyne, Andy Creed, Keefer Erickson, David Knight Footage prepared by: Cake Industries with assistance from Timelapse Scotland (Stuart Younger) www.cakeindustries.co.uk © Cake Industries 2020-21
|
D'autres médias pour cet ouvrage |