0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Crystal Palace Dinosaur Bridge fabrication and installation

Crystal Palace Dinosaur Swing Bridge Client: Friends of Crystal Palace Dinosaurs Architect: Tonkin Liu Structural Engineer: Arup Detailed Structural Engineer (substructure): Cake Engineering Fabrication & Main Contractor: Cake Industries Cutting: M-Tec Ltd Galvanising: Joseph Ash, Chesterfield Piling and foundations: Capital Piling Lifting: City Lifting Fabrication team: Oliver Cheyne, Carwyn Evans, Ed Jacobs, Marnie Robinson, Quinn Thompson Installation team: Alastair Tweedie, Oliver Cheyne, Andy Creed, Keefer Erickson, David Knight Footage prepared by: Cake Industries with assistance from Timelapse Scotland (Stuart Younger) www.cakeindustries.co.uk © Cake Industries 2020-21

Media-ID: 363990
Erstellt im/am: 31. Januar 2021
Urheber/Quelle:

Cake Industries / YouTube

Copyright-Hinweis / Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.

Veröffentlicht am:
Geändert am: 08.10.2021

Weitere Medien zu diesem Bauwerk

Großbritannien (2021)