Zhoushan Island-Mainland Connection Project Built for a Long and Efficient Life
|
Détails bibliographiques
Auteur(s): |
Chang-Jiang Wang
Hui Song Yao-Jun Ge Yong-xin Yang Wu-Gang Wang Xiang-Yang Chen |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Publié dans: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 164-165 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2007 | ||||
DOI: | 10.2749/222137807796120102 | ||||
Abstrait: |
The Zhoushan Island-Mainland Connection Project in China is a grand project with the total length of 64.6 km including 27.3 km-long five major bridges spanning five channels in succession, among which Xihoumen Bridge is a suspension bridge with its main span of 1650m, and Jintang Bridge has a main navigational channel section, a 620m long steel cable-stayed bridge. After aerodynamic investigation and vibration control related to flutter and vortex-shading having been thoroughly carried out for a efficient life of the project, severe sea environment brings about another kind of life-time problem, durability, and some new technologies are employed against chloride corrosion from the sea for a long life of the project. |
||||
Mots-clé: |
Pont à haubans pont suspendu
|