Yi Sun-sin Bridge: Technologies for Accelerated Construction of 270m-High Pylons

 Yi Sun-sin Bridge: Technologies for Accelerated Construction of 270m-High Pylons
Auteur(s): , , ,
Présenté pendant 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, publié dans , pp. 265-271
DOI: 10.2749/222137912805110493
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.16 MB

The Yi Sun-sin Bridge is a three-span suspension bridge links the Yeosu National Industrial Complex to the Gwangyang International Port in South Korea. This bridge, currently under construction, wi...
Lire plus

Détails bibliographiques

Auteur(s):



Médium: papier de conférence
Langue(s): anglais
Conférence: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Publié dans:
Page(s): 265-271 Nombre total de pages (du PDF): 7
Page(s): 265-271
Nombre total de pages (du PDF): 7
DOI: 10.2749/222137912805110493
Abstrait:

The Yi Sun-sin Bridge is a three-span suspension bridge links the Yeosu National Industrial Complex to the Gwangyang International Port in South Korea. This bridge, currently under construction, will be the first constructed long span suspension bridge with a center span over 1000m in Korea. The bridge consists of twin box girder with a main span of 1545m, two main cables 700mm in diameter, two concrete pylons 270m in height, and rock-anchored and gravity-type anchorage.

In order to open the bridge temporarily before the world EXPO to be held in Yeosu in May of 2012, the construction period should be reduced by five months. To reduce the construction period, the legs of the pylon were constructed using a slip-form method and precast cross-beams were installed by means of a heavy lifting method.

This paper presents the construction planning of pylons to improve the speed of the slip-form work. In addition, geometry control of the pylons, the concrete supply system and the erection of the cross-beams between the pylons as constructed by the heavy lifting method are briefly discussed with their field applications for the accelerated construction plan.