0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Unique access system engineering innovation leads to important milestone at MLC Centre

 Unique access system engineering innovation leads to important milestone at MLC Centre
Auteur(s): , ,
Présenté pendant IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, publié dans , pp. 1623-1629
DOI: 10.2749/vancouver.2017.1623
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.23 MB

Sydney's MLC Centre, an iconic building on the city's skyline was the tallest reinforced concrete structure in Australia when it was built in 1978. The building deteriorated over time and needed a ...
Lire plus

Détails bibliographiques

Auteur(s): (Freyssinet Australia Pty Ltd, Sydney, NSW, Australia, Freyssinet International, Rueil-Malmaison, France)
(Freyssinet Australia Pty Ltd, Sydney, NSW, Australia, Freyssinet International, Rueil-Malmaison, France)
(SCS Pty Ltd, Brisbane, QLD, Australia)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Publié dans:
Page(s): 1623-1629 Nombre total de pages (du PDF): 7
Page(s): 1623-1629
Nombre total de pages (du PDF): 7
Année: 2017
DOI: 10.2749/vancouver.2017.1623
Abstrait:

Sydney's MLC Centre, an iconic building on the city's skyline was the tallest reinforced concrete structure in Australia when it was built in 1978. The building deteriorated over time and needed a full range of treatments to its façade. To conduct repairs to the 220 m tall octagonal skyscraper, a unique site access method was designed for the project consisting of four (4) fully enclosed climbing work platforms.

When the concrete remedial repair works on one side of the building were completed all four platforms required relocation to the opposite side of the building. Hence, the Monorail relocation solution was developed. The suspended monorail system was designed and installed allowing for the platforms to be rotated on the other side of the building without dismantling.