Talavera Bridge – Description of the project and main construction issues
Auteur(s): |
Narciso Pulido
Rüdiger Spengler Rafael Pérez |
---|---|
Médium: | papier de conférence |
Langue(s): | anglais |
Conférence: | 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011 |
Publié dans: | IABSE-IASS 2011 London Symposium Report |
Année: | 2011 |
Abstrait: |
The construction presented in this paper corresponds to a cable stayed bridge of high strength white concrete with a span of 318 m over the Tajo river, in Talavera de la Reina (Spain). The total length of the bridge is completed with a 408 m postensioned concrete bridge, with typical spans of 48 m. |
Mots-clé: |
pylône amortisseurs
|