0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Residual Fatigue Strength Assessment & Rehabilitation of Rajendra Setu, Mokama, India-Case Study

 Residual Fatigue Strength Assessment & Rehabilitation of Rajendra Setu, Mokama, India-Case Study
Auteur(s): ,
Présenté pendant IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, publié dans , pp. 1295-1302
DOI: 10.2749/newdelhi.2023.1295
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 1.09 MB

Rajendra Setu (Rail Cum Road Mokama Bridge) was constructed in 1959 over river Ganga on NH-31 is of Span 3 x18,30m + 2 x 30,50m +14 x 121m + 2x30,5 m + 3x18,3m. The bridge was originally designed f...
Lire plus

Détails bibliographiques

Auteur(s): (B&S Engineering Consultants Pvt. Ltd. Noida, India)
(B&S Engineering Consultants Pvt. Ltd. Noida, India)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Publié dans:
Page(s): 1295-1302 Nombre total de pages (du PDF): 8
Page(s): 1295-1302
Nombre total de pages (du PDF): 8
DOI: 10.2749/newdelhi.2023.1295
Abstrait:

Rajendra Setu (Rail Cum Road Mokama Bridge) was constructed in 1959 over river Ganga on NH-31 is of Span 3 x18,30m + 2 x 30,50m +14 x 121m + 2x30,5 m + 3x18,3m. The bridge was originally designed for BGML loading at railway level and 2-Lane Class A or 1-Lane Class AA at roadway level. East Central Railway intends to use the train for 25T – 2008 loading which is of higher loading standard than it was originally designed for and wanted to check the residual fatigue strength and to do the necessary modification for this purpose. This paper presents the steps followed for assessing the residual fatigue strength of the truss members and the railway & roadway floor system, i.e. the railway stringers & its connections and roadway stringers. The reason for the damage of the connection of the railway central stringers with rail cross are also assessed and presented in the paper along with its remedial measures.

Mots-clé:
superstructure