The Recent Cable and Deck Erection Methods Applied in Various Types of Suspension Bridges in Korea
|
Détails bibliographiques
Auteur(s): |
Jaehong Kim
(Daelim Industrial, Seoul, Korea)
Minjae Lee (Daelim Industrial, Seoul, Korea) Jungin Kim (Daelim Industrial, Seoul, Korea) Jinhyuk Choi (Daelim Industrial, Seoul, Korea) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015 | ||||
Publié dans: | IABSE Conference Geneva 2015 | ||||
|
|||||
Page(s): | 608-615 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2015 | ||||
DOI: | 10.2749/222137815818357674 | ||||
Abstrait: |
As the designs for the modern structures are given attention to both function and aesthetics, various types of suspension bridges have begun to emerge recently in the world. Although the fundamental concept of cable and deck erection of suspension bridges have not gone through noticeable changes since the 1800s, sustainable developments for detailed erection methods were witnessed throughout the last century such as improved wire tension adjustment scheme, pre- fabricated PWS(PPWS) method, site-fabricated PWS method, high strength wire and high capacity equipment with improved functions. As a part of this global trend, almost all types of suspension bridges were built simultaneously in Korea for the past decade. Consequently, the corresponding erection methods have been developed in terms of the theories, materials and related equipment. This paper focuses on the introduction of the main features of the erection methods for five types of suspension bridges in Korea: ①self-anchored(by PPWS) with mono cable, ②conventional type with long span(by Air- Spinning, AS), ③long single-span(by AS), ④three-dimensional cables with single pylon(by AS), and ⑤multi-span with three pylons(by PPWS). The cost-effective solutions to overcome the technical challenges are established and most of the projects have finally come to a successful completion. These cable and deck erection cases described here are expected to be helpful information to find the optimal construction methods, and more generally, to plan the new types of suspension bridges such as causeway or strait crossing projects. |
||||
Mots-clé: |
pont suspendu câble tablier
|