Re-Evaluation of Aerodynamic Stability of Suspension Bridges in Seto- Ohashi Bridges

 Re-Evaluation of Aerodynamic Stability of Suspension Bridges in Seto- Ohashi Bridges
Auteur(s): , , ,
Présenté pendant IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, publié dans , pp. S34-25
DOI: 10.2749/nantes.2018.s34-25
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.51 MB

The Shimotsui-Seto Bridge, Kita Bisan-Seto Bridge and Minami Bisan-Seto Bridge are highway-railway combined suspension bridges in the Seto-Ohashi Bridges, which connect Honshu Island and Shikoku Is...
Lire plus

Détails bibliographiques

Auteur(s): (Long-span Bridge Engineering Center, Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, Japan)
(Long-span Bridge Engineering Center, Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, Japan)
(Long-span Bridge Engineering Center, Honshu-Shikoku Bridge Expressway Co., Ltd., Kobe, Japan)
(Department of Civil Engineering, Yokohama National University, Yokohama, Japan)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Publié dans:
Page(s): S34-25 Nombre total de pages (du PDF): 8
Page(s): S34-25
Nombre total de pages (du PDF): 8
DOI: 10.2749/nantes.2018.s34-25
Abstrait:

The Shimotsui-Seto Bridge, Kita Bisan-Seto Bridge and Minami Bisan-Seto Bridge are highway-railway combined suspension bridges in the Seto-Ohashi Bridges, which connect Honshu Island and Shikoku Island in Japan. Cross sections of stiffening truss girders of the bridges are identical and have two levels for transportation. Upper level and lower level are for highway and railway, respectively. In order to satisfy the aerodynamic stability, open gratings are installed at the center divider and both sides of road deck. However, since small objects may drop through them and endanger railway operation, it is disadvantageous to use them in terms of maintenance.

In order to minimize range that requires open gratings, aerodynamic stability of the bridges was re-evaluated by three-dimensional flutter analysis. This analysis method was developed after the completion of the Seto-Ohashi Bridges. From the analysis, it was found to be possible to minimize the range that requires center gratings. Also, it was found to be possible to close all center gratings by installing center barrier.

Mots-clé:
pont suspendu

Ouvrages et projets