0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Prioritization of structures for reassessment considering the value of information

 Prioritization of structures for reassessment considering the value of information
Auteur(s): ,
Présenté pendant IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024, publié dans , pp. 1153-1160
DOI: 10.2749/sanjose.2024.1153
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.55 MB

The steady increase in traffic loads in recent decades and the growing number of overweight vehi- cles crossing the bridges was not foreseen when many existing bridges were designed.

If one w...
Lire plus

Détails bibliographiques

Auteur(s): (Infrastructure Management Consultants GmbH, Zürich, Switzerland)
(Infrastructure Management Consultants GmbH, Zürich, Switzerland)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Beyond Structural Engineering in a Changing World, San José, Cost Rica, 25-27 Seotember 2024
Publié dans:
Page(s): 1153-1160 Nombre total de pages (du PDF): 8
Page(s): 1153-1160
Nombre total de pages (du PDF): 8
DOI: 10.2749/sanjose.2024.1153
Abstrait:

The steady increase in traffic loads in recent decades and the growing number of overweight vehi- cles crossing the bridges was not foreseen when many existing bridges were designed.

If one were to compare the internal forces of today's code actions with the bygone ones in a purely deterministic manner approx. 1500 bridges were to be structurally reassessed on Swiss National High- way System only. A probabilistic screening, on the other hand, which is also permitted by the Swiss codes, was deployed to evaluate reliability index in order to sort out bridges that meet reliability index requirements.

Due to the large number of bridges, it proved purposeful to determine under which circumstances the costs of a structural analysis and any resulting measures are justified by reducing the operational risk. In other words: When is the value of information from a structural analysis net positive?

Mots-clé:
structures existantes