New Alternative Solutions for Pelješac Bridge in Croatia
|
Détails bibliographiques
Auteur(s): |
Jure Radić
Zlatko Šavor Marjan Pipenbaher Gordana Hrelja Kovačević |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Publié dans: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 1896-1903 | ||||
Nombre total de pages (du PDF): | 8 | ||||
Année: | 2014 | ||||
DOI: | 10.2749/222137814814068526 | ||||
Abstrait: |
A fixed link between all parts of Croatian territory will be established after completion of the Mainland–Pelješac Peninsula Bridge over a navigable sea strait, with minimum required navigation clearance of 200x55m. The bridge is located in the high-activity seismic zone with design ground accelerationag=0,41g, strong winds and extremely adverse foundation soil conditions. The original main design of the bridge was completed and building permit was obtained. The construction of the bridge began in 2007, but it was slowed down and finally stopped in 2012 due to financial problems. Two alternative bridge solutions were proposed in the new preliminary design, a continuous steel beam bridge and a multi-span extradosed semi-integral bridge with hybrid deck. After a short account of the original bridge design, both preliminary designs are described in the paper. The multi-span extradosed semi-integral bridge with hybrid deck was chosen for further design. |
||||
Mots-clé: |
design Pont en poutre-caisson
|