0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Monitoring Structural Health of Penang Bridge Using Online System

 Monitoring Structural Health of Penang Bridge Using Online System
Auteur(s): , ,
Présenté pendant IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, publié dans , pp. 30-39
DOI: 10.2749/222137809796067641
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.04 MB

Penang Bridge was completed in 1985 as the main linkway between mainland Peninsular Malaysia and the island of Penang. The approach spans are currently being widened from 2-lane dual carriageway to...
Lire plus

Détails bibliographiques

Auteur(s):


Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Publié dans:
Page(s): 30-39 Nombre total de pages (du PDF): 8
Page(s): 30-39
Nombre total de pages (du PDF): 8
Année: 2009
DOI: 10.2749/222137809796067641
Abstrait:

Penang Bridge was completed in 1985 as the main linkway between mainland Peninsular Malaysia and the island of Penang. The approach spans are currently being widened from 2-lane dual carriageway to 3-lane dual carriageway including an additional motorcycle lane on each carriageway due to huge increase in traffic volumes since the bridge was originally completed. There is a need to monitor the structural health condition during construction activities for any possible short-term effects and also post-construction for long-term bridge performance. A monitoring system for settlement, tilt and vibration is implemented at Penang Bridge to monitor structural health. Data from sensors positioned along the full-length of the bridge are picked-up and transmitted to the data-logger system via wireless modem and this allows real-time monitoring to be carried out remotely at the control centre. The system has proven to be able to pick-up any major changes in the structural condition of the bridge and provide ample warning, especially during the current construction stage. Once the widening works has been completed, the system will remain as a permanent means of monitoring the long-term structural health of the bridge.

Mots-clé:
tassement élargissement

Ouvrages et projets