0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Monitoring Structural Health of Penang Bridge Using Online System

 Monitoring Structural Health of Penang Bridge Using Online System
Autor(en): , ,
Beitrag für IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, veröffentlicht in , S. 30-39
DOI: 10.2749/222137809796067641
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.04 MB

Penang Bridge was completed in 1985 as the main linkway between mainland Peninsular Malaysia and the island of Penang. The approach spans are currently being widened from 2-lane dual carriageway to...
Weiterlesen

Bibliografische Angaben

Autor(en):


Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Veröffentlicht in:
Seite(n): 30-39 Anzahl der Seiten (im PDF): 8
Seite(n): 30-39
Anzahl der Seiten (im PDF): 8
Jahr: 2009
DOI: 10.2749/222137809796067641
Abstrakt:

Penang Bridge was completed in 1985 as the main linkway between mainland Peninsular Malaysia and the island of Penang. The approach spans are currently being widened from 2-lane dual carriageway to 3-lane dual carriageway including an additional motorcycle lane on each carriageway due to huge increase in traffic volumes since the bridge was originally completed. There is a need to monitor the structural health condition during construction activities for any possible short-term effects and also post-construction for long-term bridge performance. A monitoring system for settlement, tilt and vibration is implemented at Penang Bridge to monitor structural health. Data from sensors positioned along the full-length of the bridge are picked-up and transmitted to the data-logger system via wireless modem and this allows real-time monitoring to be carried out remotely at the control centre. The system has proven to be able to pick-up any major changes in the structural condition of the bridge and provide ample warning, especially during the current construction stage. Once the widening works has been completed, the system will remain as a permanent means of monitoring the long-term structural health of the bridge.

Stichwörter:
Setzung Verbreiterung

Bauwerke und Projekte