0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Messina Bridge – Erection Procedures and their Structural Issues

Auteur(s):





Médium: papier de conférence
Langue(s): anglais
Conférence: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Publié dans:
Année: 2011
Abstrait:

The scale of the bridge and a tight contract schedule lead erection issues to become one of the paramount aspects in the technical and financial success of the project. The papers deals with the subject dividing it into three different categories, the general construction organization, the erection procedure and equipment and the structural behaviour during the erection that have been developed and investigated in the present design phase.

Mots-clé:
pont suspendu

Ouvrages et projets

Structurae ne peut pas vous offrir cette publication en texte intégral pour l'instant.
  • Informations
    sur cette fiche
  • Reference-ID
    10065219
  • Publié(e) le:
    03.10.2011
  • Modifié(e) le:
    05.07.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine