0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Messina Bridge – Erection Procedures and their Structural Issues

Autor(en):





Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Veröffentlicht in:
Jahr: 2011
Abstrakt:

The scale of the bridge and a tight contract schedule lead erection issues to become one of the paramount aspects in the technical and financial success of the project. The papers deals with the subject dividing it into three different categories, the general construction organization, the erection procedure and equipment and the structural behaviour during the erection that have been developed and investigated in the present design phase.

Stichwörter:
Hängebrücke

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10065219
  • Veröffentlicht am:
    03.10.2011
  • Geändert am:
    05.07.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine