0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Management of risk of exceeding design loads for reinforced concrete highway bridges

 Management of risk of exceeding design loads for reinforced concrete highway bridges
Auteur(s):
Présenté pendant IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, publié dans , pp. 1020-1025
DOI: 10.2749/guimaraes.2019.1020
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.69 MB

The following topic is analyzed in this study: risks of exceeding the required levels of load capacity of reinforced concrete bridge superstructures due to the variability of operational traffic lo...
Lire plus

Détails bibliographiques

Auteur(s): (Institute "MIGS", MADI, Moscow, Russia, doctor of technical sciences, professor, the member of Russian Academy of transport)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Publié dans:
Page(s): 1020-1025 Nombre total de pages (du PDF): 6
Page(s): 1020-1025
Nombre total de pages (du PDF): 6
DOI: 10.2749/guimaraes.2019.1020
Abstrait:

The following topic is analyzed in this study: risks of exceeding the required levels of load capacity of reinforced concrete bridge superstructures due to the variability of operational traffic loads on bridges. Decrease of load capacity during operation is mainly due to the corrosion wear of the working reinforcement. The following types of risks of loss or decrease of load capacity are considered:

undesirable – when restriction of the traffic on the bridge or reducing its durability is required; unacceptable – when termination of traffic on the bridge is necessary

critical - the danger of a catastrophic collapse with possible human victims.

During the entire period of operation, the exceedance probability of operating loads should not be lower than the one of the design load at the final stage of the bridge service.

Mots-clé:
pont ferraillage