Management of risk of exceeding design loads for reinforced concrete highway bridges

 Management of risk of exceeding design loads for reinforced concrete highway bridges
Autor(en):
Beitrag für IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019, veröffentlicht in , S. 1020-1025
DOI: 10.2749/guimaraes.2019.1020
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.69 MB

The following topic is analyzed in this study: risks of exceeding the required levels of load capacity of reinforced concrete bridge superstructures due to the variability of operational traffic lo...
Weiterlesen

Bibliografische Angaben

Autor(en): (Institute "MIGS", MADI, Moscow, Russia, doctor of technical sciences, professor, the member of Russian Academy of transport)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Symposium: Towards a Resilient Built Environment Risk and Asset Management, Guimarães, Portugal, 27-29 March 2019
Veröffentlicht in:
Seite(n): 1020-1025 Anzahl der Seiten (im PDF): 6
Seite(n): 1020-1025
Anzahl der Seiten (im PDF): 6
DOI: 10.2749/guimaraes.2019.1020
Abstrakt:

The following topic is analyzed in this study: risks of exceeding the required levels of load capacity of reinforced concrete bridge superstructures due to the variability of operational traffic loads on bridges. Decrease of load capacity during operation is mainly due to the corrosion wear of the working reinforcement. The following types of risks of loss or decrease of load capacity are considered:

undesirable – when restriction of the traffic on the bridge or reducing its durability is required; unacceptable – when termination of traffic on the bridge is necessary

critical - the danger of a catastrophic collapse with possible human victims.

During the entire period of operation, the exceedance probability of operating loads should not be lower than the one of the design load at the final stage of the bridge service.