Key technology for the construction of distributed pressure slurry extra-long pile foundation in Yellow River Wetland Reserve

 Key technology for the construction of distributed pressure slurry extra-long pile foundation in Yellow River Wetland Reserve
Auteur(s): , ,
Présenté pendant IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, publié dans , pp. 1008-1014
DOI: 10.2749/nanjing.2022.1008
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.15 MB

In view of a series of pile foundation construction problems such as the high environmental protection requirements of the Yellow River Wetland Nature Reserve, the first application of distributed ...
Lire plus

Détails bibliographiques

Auteur(s): (CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
(CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
(CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Publié dans:
Page(s): 1008-1014 Nombre total de pages (du PDF): 7
Page(s): 1008-1014
Nombre total de pages (du PDF): 7
DOI: 10.2749/nanjing.2022.1008
Abstrait:

In view of a series of pile foundation construction problems such as the high environmental protection requirements of the Yellow River Wetland Nature Reserve, the first application of distributed post-grouting technology in China, and the difficulty in implementing the traditional method of removing steel casings, this project creatively developed a self-circulating mud system; using distributed Post-grouting technology, the grouting tube and the acoustic measuring tube are combined into one, the pile side and pile end are grouted simultaneously, and the intelligent construction technology is used to monitor and control the grouting process in real time; by using the air compressor air cap technology Remove the steel guard. Finally, the construction of 72 pile foundations of the main bridge was realized, which provided a reference for the construction of pile foundations of the same type, especially the Yellow River Wetland Nature Reserve.