0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Key technology for the construction of distributed pressure slurry extra-long pile foundation in Yellow River Wetland Reserve

 Key technology for the construction of distributed pressure slurry extra-long pile foundation in Yellow River Wetland Reserve
Autor(en): , ,
Beitrag für IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, veröffentlicht in , S. 1008-1014
DOI: 10.2749/nanjing.2022.1008
Preis: € 25,00 inkl. MwSt. als PDF-Dokument  
ZUM EINKAUFSWAGEN HINZUFÜGEN
Vorschau herunterladen (PDF-Datei) 0.15 MB

In view of a series of pile foundation construction problems such as the high environmental protection requirements of the Yellow River Wetland Nature Reserve, the first application of distributed ...
Weiterlesen

Bibliografische Angaben

Autor(en): (CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
(CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
(CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
Medium: Tagungsbeitrag
Sprache(n): Englisch
Tagung: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Veröffentlicht in:
Seite(n): 1008-1014 Anzahl der Seiten (im PDF): 7
Seite(n): 1008-1014
Anzahl der Seiten (im PDF): 7
DOI: 10.2749/nanjing.2022.1008
Abstrakt:

In view of a series of pile foundation construction problems such as the high environmental protection requirements of the Yellow River Wetland Nature Reserve, the first application of distributed post-grouting technology in China, and the difficulty in implementing the traditional method of removing steel casings, this project creatively developed a self-circulating mud system; using distributed Post-grouting technology, the grouting tube and the acoustic measuring tube are combined into one, the pile side and pile end are grouted simultaneously, and the intelligent construction technology is used to monitor and control the grouting process in real time; by using the air compressor air cap technology Remove the steel guard. Finally, the construction of 72 pile foundations of the main bridge was realized, which provided a reference for the construction of pile foundations of the same type, especially the Yellow River Wetland Nature Reserve.

Stichwörter:
Pfahlgründung
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
Lizenz:

Die Urheberrechte (Copyright) für dieses Werk sind rechtlich geschützt. Es darf nicht ohne die Zustimmung des Autors/der Autorin oder Rechteinhabers/-in weiter benutzt werden.