Key Techniques Introduction to Maputo Bridge Steel Box Girders Construction
|
Détails bibliographiques
Auteur(s): |
Yaofeng Qiang
(China Communications Construction Co. Ltd., East Coast Rail Link Project, Malaysia)
Changrui Guo (China Communications Construction Co. Ltd., East Coast Rail Link Project, Malaysia) Congming Zhao (China Communications Construction Co. Ltd., East Coast Rail Link Project, Malaysia) |
||||
---|---|---|---|---|---|
Médium: | papier de conférence | ||||
Langue(s): | anglais | ||||
Conférence: | IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018 | ||||
Publié dans: | IABSE Conference Kuala Lumpur 2018 | ||||
|
|||||
Page(s): | 542-549 | ||||
Nombre total de pages (du PDF): | 8 | ||||
DOI: | 10.2749/kualalumpur.2018.0542 | ||||
Abstrait: |
Maputo Bridge in Mozambique is the largest suspension bridge under construction in Africa, which adopts a double-pylon single-span steel box girder structure with a main span of 680m. The superstructure steel box girder construction faces a series of obstacles. By researching and applying the key construction techniques, such as whole-section factory manufacturing, all girders one-time ocean shipping, complex environment wharfing and lifting, new rotating cable crane erection and site connection, and etc., the project achieved the purpose of period guarantee, quality control, environmental impact reduction and suspension bridge construction technology promotion. Furthermore, it is expected to provide a reference and engineering example for similar large-scale bridge projects in the future. |
||||
Mots-clé: |
pont suspendu
|