0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Investigations on a degraded suspension bridge: damage characterization and rehabilitation

 Investigations on a degraded suspension bridge: damage characterization and rehabilitation
Auteur(s): , ,
Présenté pendant IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, publié dans , pp. 1-8
DOI: 10.2749/222137813808626885
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.19 MB

This paper describes the experimental investigations and the planned rehabilitation programme of Teil Bridge in France. Soon after the sudden rupture of a cable near the anchorage, the bridge was c...
Lire plus

Détails bibliographiques

Auteur(s):


Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013
Publié dans:
Page(s): 1-8 Nombre total de pages (du PDF): 8
Page(s): 1-8
Nombre total de pages (du PDF): 8
Année: 2013
DOI: 10.2749/222137813808626885
Abstrait:

This paper describes the experimental investigations and the planned rehabilitation programme of Teil Bridge in France. Soon after the sudden rupture of a cable near the anchorage, the bridge was closed to traffic. Inspections were carried out to understand the sources of this event and to assess the performance of cables and strand sockets. Prior to rehabilitation, the bridge safety was improved by strengthening each socket; the bridge was then re-opened to pedestrians and cyclists only. An acoustic emission system was installed during a full year period; events related to cable ruptures were accordingly monitored. Meanwhile, several other experimental investigations on steel and concrete materials (resilience, tensile steel strength, carbonation and chloride ingresses) were led to estimate the residual structural service life of the bridge and to plan repair actions. A major rehabilitation program was then scheduled with the change of all cables and sockets. This paper presents the different stages of these investigations and the rehabilitation process.

Mots-clé:
pont suspendu renforcement

Types d'ouvrages